







|
 |
Completed
Projects | Experience | Control Engineering
& Design
Installation | Testing
CONTROL ENGINEERING AND DESIGN
-
ISO-9002
Certified
-
All drawings
done in either AutoCAD or Microstation
-
Engineering
done either using customer drawings or a complete design package by
RA
-
Designs
reviewed with customers prior to and into construction phase
-
Designs meet or
exceed industry standard:
-
Documentation
packages include the following:
-
Approval
drawings (Done within two weeks from the date of order)
-
Drawings
include bill of materials and list of nameplates
-
Preliminary
drawings to reflect revisions
-
Final or
"as built" drawings
-
Certificates
of conformance and compliance
-
All
instruction books pertaining to the installed equipment
-
Panels shipped
using secured methods:
-
Bolted,
banded and polyvinyl wrapped to skids
-
Reputable
carriers used (Customers may select their own)
-
Complete
plywood crating available
-
Overseas
crating available including vacuum sealing, use of desiccants
and fumigation of wood materials if needed
-
12 month
warranty on workmanship from date of shipment
|